Page 33 - Patrika 44-Apr-Jun-26 - Sep-1.cdr
P. 33

reducing  its  dependence  on

             freshwater  resources.  This
             demonstrates how wastewater

             can     successfully     replace

             freshwater      in    industrial

             applications            without
             compromising        operational

             efciency.

             Similar  models  are  being
             implemented       across     the

             country, including:



                               Jojobera Power Plant                                Pragati Power Station-III
                               Jharkhand                                           Delhi
                                   Reuse of
                                   4 MLD                                              120 MLD


                               Pragati Power Station-I                             IOCL Mathura Renery
                               Delhi                                               Uttar Pradesh


                                           from                                              from the Trans
                                   20 MLD  Dr. Sen Nala                               8 MLD  Yamuna Plant

             These  successful  examples  potential           users,     design  Prayagraj:            Advancing
             illustrate     the     immense     distribution    networks    and  Circular Water Management
                                                establish          institutional  Prayagraj presents one of the
             potential       of       treated
                                                arrangements                  for   most comprehensive examples
             wastewater  as  a  dependable                                         of  integrated  treated  water
                                                implementation              and
             alternative  water  source  for                                       reuse  planning.  The  city
                                                monitoring.
                                                                                   currently  operates  10  sewage
             industries and thermal power  The CLRAPs have already been
                                                                                   treatment    plants    with    a
             plants.                            completed     for   Agra    and
                                                                                   treatment  capacity  of  340
             City-Level     Reuse     Action    Prayagraj,  while  the  plan  for
                                                                                   MLD,  which  is  expected  to
             Plans:    From      Policy    to   Varanasi  is  in  its  nal  stage
                                                                                   increase  to  595  MLD  with
             Practice                           and work has commenced for         ongoing projects.
                                                Kanpur.
             To    translate    policy   into                                      The    reuse     action    plan
                                                These  plans  provide  practical
             measurable           outcomes,                                        identies           substantial
                                                roadmaps that connect sewage
             Namami  Gange  is  preparing                                          opportunities  across  multiple
                                                treatment  infrastructure  with    sectors   including     thermal
             City-Level Reuse Action Plans
                                                potential consumers of treated  power  generation,  railways,
             (CLRAPs)  for  major  cities  in
                                                water,  enabling  systematic  agriculture           and      urban
             the Ganga basin. These plans
                                                reuse       while      reducing  landscaping.
             assess  the  availability  of
                                                dependence  on  freshwater  Major proposed reuse projects
             treated     water,      identify
                                                sources.                           include:
                                                                                                               33
   28   29   30   31   32   33   34   35   36   37   38