Uttarakhand:  Sustaining  a
             Pollution-Free Main Stem
             A key highlight of the review
             was              Uttarakhand’s
             achievement  of  having  no
             polluted  stretch  on  the  main
             stem of the Ganga, as reported
             by  the  Central  Pollution
             Control  Board  (CPCB).  This
             milestone  reects  sustained
             efforts under Namami Gange
             to      strengthen       sewage
             management  systems  and
             protect the river in its upper     Uttar  Pradesh:  Expanding  these  initiatives  are  signi-
             reaches.                           Infrastructure at Scale            cantly  enhancing  the  state's
             The  state  currently  operates    In  Uttar  Pradesh,  where  the  capacity         to       manage
             70  Sewage  Treatment  Plants      Ganga  traverses  a  vast  and  wastewater and reduce pollu-
             (STPs),  most  of  which  are      densely  populated  landscape,     tion loads entering the Ganga.
             functioning  in  compliance        the  review  highlighted  the      The  review  focused  on  key
             with                 prescribed    scale and impact of interven-      urban     centres    such     as
             environmental  standards.  To      tions being undertaken across      Kanpur,  Prayagraj,  Varanasi,
             address  future  requirements      75  districts,  including  27
                                                                                   Meerut, and Ghazipur, where
             and  support  growing  urban       districts  located  along  the
             centres,  33  additional  STPs     main stem of the river.            ongoing projects are address-
                                                                                   ing  critical  challenges  related
             are under construction. These      The state has made substan-
             projects    are   expected    to   tial  progress  in  developing     to drain management, sewage
             further              strengthen    sewage  treatment  infrastruc-     treatment,  and  river  water
             wastewater management and          ture, with more than 150 STPs      quality.  The  tapping  and
             ensure that untreated sewage       already  operational.  Several     treatment  of  drains  carrying
             does  not  enter  the  river       additional  projects  are  under   wastewater  into  the  river
             system.                            implementation,  while  new        remain  central  to  ensuring
             Special attention was given to                                        that the gains achieved under
                                                facilities   are    progressing
             important     riverine    towns
                                                through  the  tendering  and       Namami Gange are sustained
             including             Haridwar,    construction stages. Together,  over the long term.
             Rishikesh,  Uttarkashi,  Tehri,
             and  Chamoli.  Discussions
             focused on enhancing sewage
             treatment capacities, bridging
             infrastructure     gaps,    and
             ensuring      the     long-term
             sustainability    of    ongoing
             interventions.  These  efforts
             are  critical  to  preserving  the
             pristine  character  of  the
             Ganga in its source state while
             supporting sustainable urban
             growth.