Page 33 - Patrika 43-Jan-Mar-26-May-19-curve-file.cdr
P. 33
Namami Gange
Brief on Projects made
operational during Q4 of 2025-26
Under the Namami Gange Mission Phase II, during the 4th quarter of the FY 2025-26, ve
projects have been completed, and ve projects have been partially completed and made
operational. With the commissioning of this project, the total STP Capacity commissioned
under the Namami Gange Programme stands at 4,260 MLD, and the total number of STPs
commissioned stands at 185.
1.I&D with STP works at
Sapera Basti, Dehradun,
Uttarakhand.
a) The project ‘I&D with STP
works at Sapera Basti,
Dehradun’ was sanctioned at
an estimated cost of Rs. 78.99
Crore under the Namami
Gange Programme. The major
components of the project 15 MLD STP at Sapera Basti
include: 2.I&D and STP Works at 91,000 people by tapping their
I. Sewage Treatment Plant Vrindavan, Uttar Pradesh generated sewage through the
(STP) – 15 MLD (1 STP). a) The project ‘I&D and STP Interception and Diversion
b) This STP is developed on Works at Vrindavan, Uttar components, thereby
Sequential Batch Reactor Pradesh’ was sanctioned at an improving the city's sanitation
(SBR) technology and has estimated cost of Rs. 77.70 status and avoiding discharge
of untreated sewage to the
been designed to treat the Crore under the Namami
River Yamuna.
wastewater to meet the Gange Programme. The major
stringent discharge standards components of the project
as prescribed by the Hon’ble include:
National Green Tribunal. I. Sewage Treatment Plant
c) The project has been (STP) – 13 MLD (1 STP).
implemented on the DBOT b) This STP is developed on
Model. Sequential Batch Reactor
d) The project will benet a city (SBR) technology and has been
population of approximately designed to treat the
17,00,000 people by tapping wastewater to meet the strin-
13 MLD STP, Vrindavan
their generated sewage gent discharge standards as
3. Pollution Abatement
through the Interception and prescribed by the Hon’ble
Works, Salori Prayagraj,
Diversion components, National Green Tribunal.
Uttar Pradesh.
thereby improving the city's c) The project has been imple-
a) The project ‘Pollution
sanitation status and avoiding mented on the DBOT Model.
Abatement Works, Salori
discharge of untreated sewage d) The project will benet a city
Prayagraj, Uttar Pradesh., was
to the River Ganga. population of approximately sanctioned at an estimated
33